Always use a moisture bearer which is usually placed between the subfloor and the finished floor.
Fixing wood flooring to concrete.
Nail boards into place step 4.
The surface of the concrete must be flat and free of oil grease and dust.
Gluing solid parquet flooring directly to a concrete slab solid parquet hardwood flooring can be glued directly to a concrete slab on grade or above grade with the use of a manufacturer recommended vapor retarder.
Blow the residual dust out of the concrete hole using a vacuum or syringe blower.
Concrete is not the easiest material to work with especially if you re trying to build a structure like a house that involves the use of both concrete and wood products.
I have my doubts on this and would like to figure out what the expectation for a 5.
Sign up now for tim s free weekly newsletter at.
Mark the holes in the concrete and wood using a permanent marker first to make sure your holes are precise.
Allow the thinset to completely dry before you seal the.
Concrete must be a minimum of 30 days old.
Most professional installers use two methods for attaching the subfloor to the concrete.
Fortunately there are many ways to make the transition from concrete floors and wall frames to wood floors and drywall.
Sand the boards step 5.
After 3 attempts and 5 months to fix numerous creaks in the floor the installer is now claiming.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Treated plywood to the concrete with concrete screws spaced every 16 in.
That s the way h w floors are.
Drill completely through the wood and about 1 4 inch 0 64 cm deeper than the screw s length into the concrete.
Put vapor barrier in place step 3.
Remove damaged pieces of flooring step 2.
How to repair hardwood flooring step 1.
We had a h w floor installed by the builder on concrete slab.