Fire pump sprinkler ring main system f.
Fire pump testing checklist.
An fm global engineer also can provide the characteristic curve for the annual flow test fm global form 105 pump acceptance test data.
During pump operation record results for each weekly test in the appropriate column for all items listed.
Using the checklist attached below and consider the following.
The test should be performed by attaching hoses to the discharge test header.
Fire alarm main sub panel b.
To help ensure the fire or booster pump is working there needs to be periodic inspection maintenance and testing of the pump.
However nfpa 25 charges the property owner with maintaining complete written reports of fire pump test results 8 4.
Plot the pump curve and match it with the factory test curve.
Exit directional sign test a.
All fire pump stop pressure fire pump shut off pressure minimum suction pressure.
Annual fire pump flow testing if a flowmeter is used verify that it is arranged so as to test both pump performance and suction supply yes no proper number of listed 2 inch hose valves is provided on test header 2 for 500 gpm 3 for 750 gpm 4 for.
Electric fire pump inspection checklist instructions.
All fire pumps should be run and tested weekly.
The fire pump flow test is required by nfpa 25 to be conducted once a year in order to measure the pump s flow and pressure.
At a minimum the report must include 8 4 1 1.
A separate checklist for electric pump and diesel pump is attached at the end of the document.
Manual call points c.
Test all fire pumps daily weekly.
Fire pump testing and maintenance checklist ask an fm global engineer to take these steps n fill out the essential information on this form.
Fire pump testing is complex and must be performed by qualified professionals.
Weekly fire pump test form.
Set pressure switches to the following setting valves.
Leave the pump in automati c start mode after testing.
The jockey pump start point should be at l east 0 68 bar 10 psi less than the jockey pump stop point.
If a need for repairs or adjustments is discovered during the weekly testing they should be made immediately following the.
The fire pump start point should be 0 34 bar 5 psi less than the jockey pump start point.
Annual fire pump flow test.
Open system valve and turn all isolating valves to the fully open position.
U se 0 68 bar 10 psi increments for each additional pump.
Sprinkler control valves water proving test h.
N provide flow test results.
Testing of automatic operation of fire pump.
Pressurisation staircase air velocity test i.
N mark the correct settings.
Smoke cut off switch in ahu e.
Impairments should be managed via a.
Establish a program of regular inspection testing and maintenance to ensure your fire pump performs its critical function during a fire.